GE Careers
Apply Now    

Project Scheduler (m/f)

  • GE Power
  • Experienced
  • Posted 2/9/2018 8:50:44 AM
  • 3039787
  • Job Function: Project Management
  • Business Segment: Power Gas Power Systems
Location(s): Austria; Jenbach


About Us:
This position is based in the center of the Alps, in Tyrol - a region that provides a pleasant variety of recreational opportunities and a high quality of life. We are passionate about making life better with new ideas and technologies. You can expect to join a diverse team, which offers comprehensive and international career opportunities and is known for leadership development. Our 1,500 employees at our location Jenbach are working in a collaborative way to power the future.
GE’s reciprocating engines business sets an industry standard for fuel flexibility, lower emissions and higher efficiency. It specializes in developing local power near or at the point of use and gas compression solutions that deliver environmental friendly, more efficient, more affordable power to customers around the world.

Role Summary:
The position holder is part of the project controls team and responsible for establishing delivery/installation/commissioning schedules on larger scaled projects and to provide accurate and comprehensive site Planning and Schedule reporting to the Project management Team.
Job reference #3039787.

Essential Responsibilities:

  • Assure all site Planning is in accordance with Sector and Business Guidelines.
  • Set up and manage individual overall project schedules (civil, electrical and mechanical) using MS Project 2016, Primavera P6 and other Project scheduling tools.
  • Able to resource man load and provide required manpower graphs and reports.
  • Merge, import and export individual projects into a master schedule.
  • Provide updates on remaining work and perform schedule impact analysis for change orders.
  • Provide the project manager with monthly project updates and projections.
  • Run slipping task reports for the Project Managers
  • Provide schedule comparison when a new schedule comes out for the PM to analyze and coordinate with both internal customers and external customers.
  • Maintain a master all work schedule with all resources accounted for in the schedule.
  • Provide and maintain monthly presentations and executive reports.
  • Maintain an executive monthly report (All Jobs).
  • Visit sites to acquire real time data and/or present the schedules with project manager. Travelling required.

    Qualifications/Requirements:

    • Engineering degree technical college (mechanical or electrical), logistic education
    • Experience in energy generation business and/or power plants
    • Experience in developing overall project schedules
    • MS project, Primavera P6 and project online are beneficial
    • English, German fluency (written + spoken)
    • Ability to develop good client relationship
    • Ability to understand complex dependencies of tasks
    • A valid work permit for Austria is a prerequisite for this position (Non-EU citizens: please attach the work permit to the application)

    We put great emphasis on providing our employees with recognition, flexibility, competitive and fair compensation, as well as numerous other benefits.
    According to Austrian law, job postings need to include the minimum salary for a position. For this position, the minimum salary based on the collective agreement is EUR 2,785.54 gross per month. We will be pleased to discuss the appropriate effective salary based on your qualifications and experience.

    Locations: Austria; Jenbach

    GE offers a great work environment, professional development, challenging careers, and competitive compensation.  GE is an Equal Opportunity Employer.  Employment decisions are made without regard to race, color, religion, national or ethnic origin, sex, sexual orientation, gender identity or expression, age, disability, protected veteran status or other characteristics protected by law.


Apply Now    
Link for schema

GE Careers Technical Assistance

Having technical issues with ge.com/careers or your application? We're here to help.

Get In Touch

Connect With Us

Stay up to date on GE and possible opportunities that open in areas that interest you.

Sign Up