GE Careers
Apply Now    

Project Scheduler

  • GE Power
  • Experienced
  • Posted 11/22/2017 4:50:28 PM
  • 3008456
  • Job Function: Project Management
  • Business Segment: Power Gas Power Systems
Location(s): Mexico; Mexico City


About Us:

GE is the world's Digital Industrial Company, transforming industry with software-defined machines and solutions that are connected, responsive and predictive. Through our people, leadership development, services, technology and scale, GE delivers better outcomes for global customers by speaking the language of industry.



Role Summary:

Responsible for project delivery, profit & loss accountability, and customer satisfaction through management of project related activities and resources.



Essential Responsibilities:

  • Develops the Level 3 integrated EPC (Engineering, Procurement, and Construction) project control schedule based on contract requirements in cooperation with all involved scope owner parties.

  • Obtains the Participants commitment on a Common Target Schedule and secures acceptance by all the relevant participants / functions.

  • Ensures that the contractual and internal key milestones are appropriately shown in the EPC Schedule for all project phases, by including items such as payment milestones, client interface milestones, design freeze, document turnover (DTO), civil turnover to erection (CTO), material handover (MHO) and system turnover packages (TOP).

  • Coordinate with the functional owners to prepare the schedule requirements to be distributed to Third Parties including Consortium partners, product lines, external vendors/subcontractors, etc. Integrate Third Party schedules (baselining and updating).

  • Identifies any deviation and potential delays from the original program and takes the necessary mitigation actions together with the relevant project team members to recover. Ensures a pro-active and transparent schedule activity forecasting in order to identify in advance potential delays and to suggest effective recovery action plans.

  • Establishes, implements and maintains the required internal and external reporting procedures. Particular emphasis is put on establishing an effective mechanism for identifying risk and opportunities that may impact on the timely completion of the Project. Such issues and events are drawn to the attention of the project team for immediate necessary actions.

  • Prepare monthly schedule KPIs and lead schedule review with GPS management team.

  • Measures and communicates periodically the project performance in the different phases monitoring the progress status, the trend indicators and the milestones achievement.

  • Proactively manages internal and external project activities, ensuring project completion on or before the contractually agreed time by monitoring closely the Critical Paths and the Project Float constantly.

  • Partner with Site Planners to monitor and control in details the site progress and the relevant interfaces between the different work phases as defined in the detailed site programme fully consistent with the EPC schedule. Set up CMS tracking system.


  • Qualifications/Requirements:

  • Certified Engineer or bachelor’s degree.

  • Knowledge of Primavera P6 and other similar planning software.

  • Fluency in English & Spanish

  • 5-10 years experience in Combined Cycle Projects.

  • Knowledge of power plant principles and work processes in an engineering, procurement and construction environment.


  • Desired Characteristics:

  • Extensive experience in a Project Controls or Project Management function within an EPC environment, including execution of several projects with significant site exposure.

  • Experience in claims and forensic planning.


  • Locations: Mexico; Mexico City

    GE offers a great work environment, professional development, challenging careers, and competitive compensation.  GE is an Equal Opportunity Employer.  Employment decisions are made without regard to race, color, religion, national or ethnic origin, sex, sexual orientation, gender identity or expression, age, disability, protected veteran status or other characteristics protected by law.


    Apply Now    
    Link for schema

    GE Careers Technical Assistance

    Having technical issues with ge.com/careers or your application? We're here to help.

    Get In Touch

    Connect With Us

    Stay up to date on GE and possible opportunities that open in areas that interest you.

    Sign Up